Detailed engineering

Detailed engineering is the final step of preparation for the new building construction. Tender documentation is based on drawings which were made on the stage of detailed engineering and fully prepared technical specifications. This documentation is sent to suppliers of equipment and construction contractors in order to receive final offers. Equipment delivery is an essential part of engineering services. Partnership relations both with Russian and with foreign equipment manufacturers, ensure compliance of equipment delivery works at the highest level.

 The procedure of detailed engineering consists of the following steps:

  • Confirmation of facility examination results
  • Preparing of detailed technological schemes
  • Preparing of specifications for equipment and systems
  • Preparing of main procedures by types of works
  • Detailed general construction calculations (analysis of building footing, props, passing modules, enclosures etc.)
  • Detailed calculations for systems
  • Integration and interaction of all applicable systems
  • Preparing of detailed technological documentation (piping connections, technological isometric projection etc.)
  • Detailed technological calculations (material balance, hydraulic systems, stress analysis etc.)
  • Preparing of various reports (reports of working process, procurement, engineering etc.)
  • Preparing and realization of supervision and acceptance of equipment
  • Preparing of detailed general construction documentation (facility, cable passages, building footings etc.)
  • Overall philosophy of management
  • Quality control, quality supply
  • Organizing of operations manual
  • Preparing of quality control and safety procedures